Case Study
US Bank Stadium
Minnesota Vikings
Number of Bins
Milk Jugs Saved

Overview
property Wide Waste & Recycling Bins
Max-R partnered with the newly constructed US Bank Stadium to outfit their entire facility with waste and recycle bins. In conjunction with US Bank Stadium, we designed several bins customized to the needs of the specific location within the facility and the waste streams required for those areas.
Discovery
- Newly-Constructed Stadium
- Bins Needed for Entire Property
- Future Organic Waste Collection Desired
After the initial consultation and in order to make the goals set in place by US Bank Stadium a reality, our ideation team went to work in conceiving the best solution to the pain points addressed.
Concept
In addition to their current needs and waste streams, we took into account the stadium’s desire for future compost collection and designed a bin that would easily transition to collect trash, recycling and compost to meet the team’s current and future sustainability goals.
- Interchangeable Lids for Future Streams
- Bins Designed for Custom Stadium Needs
Visualization
Our design team crafted a 3D rendering with all of the desired customization along with the concept of future-proofed bins. Once the configurations, graphics, and colors are approved by the US Bank Stadium team, our engineering team drafted functioning proofs for final sign-off.
The Results
They speak for themselves, don’t they? With the inclusion of labels and interchangeable graphics from Recycle Across America, US Bank Stadium was able to get closer to their Zero Waste goals.
Feeling Inspired?
Every facility has unique goals and challenges, but don’t sweat it—our team will walk hand-in-hand with you to discover your sustainability pain points and how to overcome them.